ReNew Amston 2
00 Old Amston Road, Colchester, CT
This portion of the property offers another 5 MW of highly reliable behind-the-meter (BTM) power that is fully permitted and ready for development, providing a strong foundation for your sustainable data center deployment. Power capacity can be expanded in a potential phase 2, allowing for future scalability as demand grows.
The site can support up to 20,000–40,000 sq. ft. of data center facility, with flexible design options based on the buyer's specific requirements. While the BTM power infrastructure is permitted, it has not yet been constructed, allowing the buyer to coordinate development timelines with the power provider. The property is prepared for the buyer/builder to submit for local building permit applications based on their desired facility design, with local permitting and construction of the data center to be the responsibility of the buyer/off-taker.
The land is available through a $1 ground lease, contingent upon execution of a Power Purchase Agreement (PPA) with the on-site power pad developer. The BTM PPA pricing is highly competitive with current grid pricing, offering cost-effective and reliable power supply.
In support of ESG and sustainability goals, the project includes opportunities for on-site carbon capture and hydroponic farming, creating a unique model that integrates power generation with community engagement and environmental stewardship.
Development area
5 +/- Acres
Land Description: generally level and private, some conservation area, and on a dead end municipal road.
Primary power
Natural Gas Fuel Cells
EverSource has a substation 800+/- feet away.
Gas
Yankee Gas
Yankee Gas is onboard with the gas required for the project, and will provide a service agreement.
Fiber
Carrier Neutral
The project is “carrier neutral” at this time. The fiberoptic carriers locally are Crown Castle and Nutmeg Network (CEN)
Key Details
- Development Site Size:
- approx. 5 acres shovel-ready
- Power Capacity:
- 5MW being offered in this portion, power is permitted for up to 18MW in potential expansion (building permitting required)
- Primary Energy Source:
- Natural Gas Fuel Cells
- Available Backup Energy Source:
- grid interconnection, back up generators, BESS
- Fiber:
- Available
Site Details
- Site Control:
- $1 lease upon executed PPA agreement
- Expandability:
- Yes - we can discuss the possibilities.
- Zoning:
- Commercial
- Permitting:
- BTM power permits complete, builder responsible for local land use and building permits
- Due Diligence:
- Reports available in secure data room upon request/approval
- Agreement Type:
- $1 land lease with PPA - Option to Purchase
- Project Type:
- All options are available (Powered Site, Turnkey, Colocation, Build-to-Suit, Build-to-Order, Design-Build, Fee Development)
Power & Procurement
- Substation Adjacency:
- Substation +/- 800 ft away - long-term grid interconnection is possible
- Retail Model:
- Stable PPA for reliable BTM power with very competitive and predictable pricing
Approved power
Ready-to-go
Extensive surveying, environmental review, and power regulatory approvals have already been completed. The groundwork is in place, allowing qualified builders/developers to move forward with confidence and significantly reduced timeline risk.
Survey & Engineering Performed
Surveying was performed by Reynolds Engineering Services. Engineering was performed by All-Points Technology Corp and Reynolds Engineering.
Lease/PPA/ESA Specifics
We will set the pricing and terms for all Agreements with the Purchaser once the development specifications are established
Environmental
An Environmental Report was performed in 2022 and is available for review. The site was an old junkyard / Brownfield site which we did significant clean up on and today is ready to construct on.
Regulatory Approvals
With fuel cell generation pad approval, the buyer/builder is only responsible for permitting of its site plan and buildings.
Multiphase Approach
This property has multiple development options, and options for the power pads, battery storage, carbon capture initiatives etc. We will discuss these directly with qualified Purchasers.
Phase 1:
5 Megawatts – available for reservation now through Gray Wolf Data Centers.
Phase 2:
The 5MW being offered in this portion may be expandable in a potential phase 2.