ReNew Riverside

New Data Center Pad In Bristol, Connecticut

For DC Pad + PPA for up to 4MW of CT designed Class 1 power.

Property Address
234 Riverside Drive (RT 72), Bristol, CT. Bristol, Connecticut is home to ESPN.
Lot Size
1.62 acres; 265’ frontage on Riverside Avenue.
Description
Generally level, slopes downward toward rear of property toward boundary with Pequabuck River.
Zoning
Commercial
Utilities
City of Bristol Sewer and Water, Eversource, and Yankeegas.
Power EDC
EverSource. EverSource has performed a feasibility study for any overflow power that will be sent to the grid.
Natural Gas Company
Yankeegas. Yankeegas is on board with the gas required, has provided a service agreement, and plans infrastructure improvements to service the project.
Fiberoptic Carriers
The project is “carrier neutral” at this time. The fiberoptic providers in the area are Crown Castle, Level 3 Metro, Zayo Metro, and Nutmeg Network.
Regulatory Approvals
The fuel cell generation pad is approved for 4MW of power generation by the Connecticut Siting Council. The City of Bristol is also supportive of the project. The buyer will be responsible for permitting of its data center building.
Survey/Engineering Performed
Surveying was performed by BL Companies. Engineering was performed by All-Points Technology Corp and Reynolds Engineering Services, LLC.
Environmental
A current Environmental Report from 2023 was done prior to the demolition of the site’s old building.
PPA/ESA Agreements
We will determine the price, and customize the power/energy service agreement specifics upfront with the Purchaser prior to construction.